Connect with us

Hi, what are you looking for?

Smart Success Strategy – Investing and Stock NewsSmart Success Strategy – Investing and Stock News

Editor's Pick

Steppe Gold Files Updated Preliminary Economic Assessment for the Tres Cruces Oxide Gold Project

Steppe Gold Ltd. (TSX: STGO) (OTCQX: STPGF) (FSE: 2J9) (‘ Steppe Gold ‘ or the ‘ Company ‘) is pleased to announce the filing of an updated preliminary economic assessment (the ‘ Technical Report ‘) regarding its 100% owned Tres Cruces Oxide Gold Project located in Peru (‘ Tres Cruces ‘).

Chairman and CEO of Steppe Gold, Bataa Tumur-Ochir commented, ‘We are delighted to announce this updated technical study for the Tres Cruces project. Tres Cruces is strategically located in a highly prospective geological belt that hosts the Lagunas Norte and La Arena mines, both with multi-million ounce gold production. The Tres Cruces deposit contains oxide plus sulphide indicated resources of 2,474,000 ounces with a grade of 1.65 g/t gold, inclusive of 630,000 ounces contained within leachable gold oxide mineralization with a grade of 1.28 g/t gold. Located in the La Libertad, Peru, surrounded by operating mines with the attendant infrastructure and talent pool, this asset shows great potential as a new production zone for Steppe Gold. We are excited with the strong economics confirmed by recent drilling and metallurgical testing, as well as the exploration potential across the license area.’

TECHNICAL REPORT HIGHLIGHTS

Infill drilling completed in 2022 confirmed continuity of mineralization. Metallurgical test work returned average recoveries of 82% Au, confirming design assumptions. Construction costs escalated 4.5% based on market data to reflect inflationary pressures. The initial capital expenditure estimate increased by $6 million to $131 million driven by equipment and labor costs. Operating costs rose 3.6% due to consumables, reagents, contract mining services. Life of mine operational expenditure estimate is now $297 million, up 3.6% from the Prelimary Economic Assessment dated effective March 14, 2022. Operational expenditure per tonne processed is now estimated at $19.93/t. At $1700/oz gold, the after-tax net present value is $158 million with 30.9% IRR. Despite the cost increases, the project economics remain robust with significant upside potential. Mine schedule unchanged with Phase 1 focused on maximizing value from the oxide gold cap. Experienced team continues to systematically advance the oxide project. Significant exploration potential remains with mineralization open at depth.

TECHNICAL REPORT ASSUMPTIONS AND RESULTS Description Units Net Present Value (NPV 5%) Pre-Tax US$ (million) $294.3 Net Present Value (NPV 5%) After-Tax US$ (million) $158 After-Tax Internal Rate of Return (IRR) % 30.9 Payback Period Years 2.1 LOM Cumulative Cash Flow US$ (million) $235.6 LOM All-In Sustaining Costs (AISC) US$/oz $734 Pre-Production CAPEX US$ (million) $125.2 Sustaining CAPEX (LOM) US$ (million) $5.2 Mine Life Years 7 Average Processing Rate Tonnes/day 5,800 LOM Strip Ratio 2.89:1 Average Gold Recovery % 81.7 Average Annual Gold Production Oz/year 68,000 Total LOM Gold Production Ounces 481,000

Mineral Resource Estimate

The current resource prepared by Jeffrey Rowe and James Gray (Advantage Geoservices), published in March 2021, was an update of the Technical Report by Lacroix and Associates (L&A) dated September 2012 for previous owner New Oroperu Resources (which is now a wholly-owned subsidiary of the Company). The estimate used the geologic models of lithology and alteration that were developed for the L&A resource, but divided the deposit by mineralization type (oxide, transition, or sulphide). Gold grade correlation based on geology was not readily apparent and the decision was made to use a 0.2 g/t grade shell as control for grade estimation. This shell was generated using an indicator estimation method. A total of 327 holes have been used for this estimate, of which 159 were RC holes and 168 were core holes. Sample grades were composited to a down-hole length of 3 m. Assays, subdivided by grade domain, were capped in a conventional manner prior to compositing.

Gold grades were estimated inside and outside the mineralized grade shell by ordinary kriging, into blocks with dimensions of 10m x 10m x 5m (X/Y/Z). Average density values were assigned by lithology based on 2,700 core density measurements.

The resource has been classified based on spatial parameters related to drill density and configuration, and the generation of an optimised pit. Blocks were initially classified as Inferred where the average distance to the closest three holes is within 80 m, and as Indicated where the average distance to the closest three holes is within 50 m. Pit optimization included variable cost and recovery values dependent on mineralization type. All material included in the Mineral Resource Estimate is contained within the optimized shell.

Mineral Resource Estimate

Resource Classification

Indicated Inferred Tonnes (1000’s) Au (g/t) Oz Au (1000’s) Tonnes (1000’s) Au (g/t) Oz Au (1000’s) Oxide (0.3 g/t cut-off) 9,636 1.37 425 487 0.75 12 Transition (0.3 g/t cut-off) 5,707 1.12 205 361 0.60 7 Sulphide

(0.9 g/t cut-off) 31,132 1.84 1,844 1,713 1.55 85 Total 46,475 1.65 2,474 2,561 1.26 104

The Technical Report only considers mining and processing of leachable oxides and transition materials from the Indicated and Inferred resource categories. Sulfide mineralization is considered a future opportunity and does not currently factor into mine planning, processing or financial results as reported in this PEA.

DISCLOSURE

The Technical Report results are summarized for purposes of this press release. Further details on the Technical Report are available under the Company’s profile on SEDAR+ at www.sedarplus.ca and on the Company’s website at www.steppegold.com.

The Technical Report is preliminary in nature and it includes inferred mineral resources that are considered too speculative to be used in an economic analysis except as allowed for under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (‘ NI 43-101 ‘). There is no guarantee that the inferred mineral resources can be converted to Indicated or Measured mineral resources, and as such, there is no guarantee the project economics described in this release will be achieved.

QUALIFIED PERSONS
The following persons, all of whom are qualified persons under 43-101, have approved the disclosure contained within this release:

Name of Qualified Person Company Qualification John Woodson M3 Engineering & Technology Corporation P.E. Laurie Tahija M3 Engineering & Technology Corporation QP-MMSA Jeff Rowe Independent Geologist P.Geo. Adam Johnston Transmin Limited FAusIMM CP(Met) James N. Gray Advantage Geoservices Limited P.Geo. John Nilsson Nilsson Mine Services Ltd. P. Eng.

The Technical Report was prepared in accordance with NI 43-101. The study was prepared by M3 Engineering and Technology Corporation of Tucson, Arizona and Arequipa, Peru, in cooperation with Nilsson Mine Services of Pitt Meadows, BC, Transmin Ltd., of Lima, Peru, Advantage Geoservices Ltd. of Chilliwack, BC, and Jeffrey Rowe of Surrey, BC.

About Steppe Gold

Steppe Gold is Mongolia’s premier precious metals company.

For Further information, please contact:

Bataa Tumur‐Ochir, CEO and Chairman

Shangri‐La office, Suite 1201, Olympic Street 19A, Sukhbaatar District 1,
Ulaanbaatar 14241, Mongolia
Tel: +976 7732 1914

Cautionary Statements Regarding Forward‐looking Information

This news release contains ‘forward‐looking information’ which may include, but is not limited to, statements with respect to the future financial or operating performance of the Company and its projects. Often, but not always, forward‐looking statements can be identified by the use of words such as ‘plans’, ‘expects’, ‘is expected’, ‘budget’, ‘continues’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘potential’, ‘anticipates’, or ‘believes’ or variations (including negative variations) of such words and phrases, or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will’ be taken, occur or be achieved. Forward‐looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward‐looking statements. Forward‐looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any forward‐looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that forward‐looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward‐looking statements if circumstances, management’s estimates or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on forward‐looking statements.

News Provided by GlobeNewswire via QuoteMedia

This post appeared first on investingnews.com
Enter Your Information Below To Receive Latest News, And Articles.



    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    You May Also Like

    Editor's Pick

    The energy revolution is here to stay, and electric vehicles (EVs) have become part of the mainstream narrative. Despite geopolitical tensions and uncertainty, the...

    Editor's Pick

    Overview Mexico’s Sinaloa state hosts a number of prolific silver and gold mines, including McEwen Mining’s (TSX:MUX) El Gallo Complex, Americas Gold and Silver’s...

    Editor's Pick

    Uranium is an important energy sector commodity, and its rising value has attracted investor interest. 2023 has seen uranium prices solidly above the important...

    Investing

    A new survey shows that the presidential race between former President Donald Trump and President Biden is thin, but Biden faces a deficit in...

    Disclaimer: smartsuccessstrategy.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.


    Copyright © 2024 smartsuccessstrategy.com