Connect with us

Hi, what are you looking for?

Smart Success Strategy – Investing and Stock NewsSmart Success Strategy – Investing and Stock News

Editor's Pick

Significant High-Grade Lithium Achieved at Drill Hole 2 at Rio Grande Sur

Pursuit Minerals Ltd (ASX: PUR) (“PUR”, “Pursuit” or the “Company”) is pleased to provide the following update on its maiden Stage 1 Drilling Program with the first results and assay samples from drill hole 2 (“DDH- 2”) on the Sal Rio 02 tenement.

HIGHLIGHTS

Drillhole 2 (DDH-2) at the Sal Rio 2 tenement of the Rio Grande Sur Project, has hit significant high grade intercepts of lithium brine at shallow depths of ~161m.DDH-2 recently completed with additional lithium bearing brines continuing to be intercepted below 130m to the final depth of 500m, with assays pending and results expected over the coming weeks.Initial high-grade assays include the following intervals:498mg/L (“milligrams per liter of Lithium”) from an interval of 63m to 65m504mg/L from an interval of 72m to 74m506mg/L from an interval of 121m to 123m511mg/L from an interval of 159m to 161mThe hole recently completed reaching a final depth of 500m with assays and packer samples currently being analysed.The Stage 1 Drill Program is targeting resource growth to the existing inferred JORC resource of 251.3kt LCE @ 351mg/L1.

In relation to the progress of DDH-2 at the RGS Project, Pursuit Managing Director & CEO, Aaron Revelle, said:

“The initial results from DDH-2 are especially exciting as we progress our initial exploration phase of the Rio Grande Sur Project. With these initial intercepts at DDH-2, we are continuing the significant advancements we have made in our understanding of the RGS Project mineralisation following on from the high-grade results from DDH-1. We now have multiple drill hole intercepts above 500mg/L Li which continue to demonstrate the potential significant scale of the project.

“We continue to progress with permitting for the Mito tenement in the north of the Rio Grande Sur Project, which we intend to include in our Stage 1 program and as the preferred location for DDH-3 as we target a significant mineral resource upgrade. This is in addition to the ongoing production works at our Lithium Carbonate Pilot Plant which remains on track to produce our first Lithium Carbonate before the end of the year, with Pursuit having already received multiple requests for product samples from potential off-take partners.”

High-Grade, Shallow Depth Lithium Brine Assay Results

DDH-2 on the Sal Rio 02 tenement, part of the Stage 1 drilling program, commenced on site at the Rio Grande Sur Project in July 2024; and completed in mid-August with the hole reaching a depth of 500m.

Throughout the first several hundred metres, the on-site geologists and drilling team have been extremely encouraged by the geological units encountered with many comparables to the favourable geological units of DDH-1 at the Maria Magdelena tenement.

Intercepts from DDH-2 have shown highly favourable geology consistent with the results from DDH-1 with elevated brine grades ~500mg/l Li. Lithium brine samples captured for assays are currently being analysed with the first preliminary results to a depth of 160m completed.

Notable intercepts from the first 160m of DDH-2 include:

498mg/L (“milligrams per liter of Lithium”) from an interval of 63m to 65m504mg/L from an interval of 72m to 74m506mg/L from an interval of 121m to 123m511mg/L from an interval of 159m to 161m

Following completion of DDH-2, Pursuit is currently awaiting environmental approvals to commence drilling at DDH-3 which is to be relocated to the Mito tenement in the north section of Rio Grande. Pursuit is targeting a material resource upgrade in 2024, which will build on the recent maiden resource defined at the Rio Grande Sur Project.1 The adjustment of DDH-3 from the southern section to the northern section is focused on maximising this resource upgrade target, with intercepts of ~900mg/l Li obtained from an adjacent project some ~2km to the east of the proposed location of DDH-3.

Click here for the full ASX Release

This post appeared first on investingnews.com
Enter Your Information Below To Receive Latest News, And Articles.



    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

    You May Also Like

    Editor's Pick

    The energy revolution is here to stay, and electric vehicles (EVs) have become part of the mainstream narrative. Despite geopolitical tensions and uncertainty, the...

    Editor's Pick

    Overview Mexico’s Sinaloa state hosts a number of prolific silver and gold mines, including McEwen Mining’s (TSX:MUX) El Gallo Complex, Americas Gold and Silver’s...

    Editor's Pick

    Uranium is an important energy sector commodity, and its rising value has attracted investor interest. 2023 has seen uranium prices solidly above the important...

    Investing

    A new survey shows that the presidential race between former President Donald Trump and President Biden is thin, but Biden faces a deficit in...

    Disclaimer: smartsuccessstrategy.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.


    Copyright © 2024 smartsuccessstrategy.com